Find or Sell any Parts for Your Vehicle in USA

Arias Pistons 12.5:1 Compression 82mm Bore Honda B-series on 2040-parts.com

US $499.99
Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Brand:Arias Manufacturer Part Number:3330420

Categories
WHY CHOOSE US
Arias Pistons 12.5:1 Compression 82mm bore Honda B-Series
Description

Honda/Acura B18c1 DOHC VTEC 
1.8L 
Stock Bore: 82mm
Stroke: 3.433
Rod: 5.430
Head CC: 41.6
Gasket: .028
Deck: .005
Compression Height: 1.180
Dome CC: 6
Compression Ration with Stock Head: 12.5:1 
Required Ring set: 1012303228



Payment is accepted only through Paypal.

We will only ship to the Paypal confirmed shipping address.

Payment for orders should be made within 5 business days.

Sales tax will be charged for orders from Florida.

If you require another payment arrangement, please contact us by email or eBay seller messages.
You may also like this

July 7: A couple of suggestions

Wed, 07 Jul 2010

Since I got home with more than half a charge last night I didn't plug it in. I ran a couple errands, 10 miles, then drove 22 miles to work. So that's 22 plus 22 plus 10 and I drained the battery.

Ariel Atom 700 is a turbo-supercharged 700-hp track weapon

Wed, 01 Aug 2012

If you're willing to ditch sleek supercar looks and just about every automotive creature comfort in the pursuit of pure performance, you might consider the Ariel Atom 3. Powered by a 2.4-liter Honda I4 engine cradled in an exoskeletonlike frame, the Atom 3 boasts a 0-to-60-mph time of just 2.9 seconds But maybe those performance numbers just aren't enough for you. If so, Piedmont, S.C.-based DDMWorks might have a solution.

BID TO SLOW TRAFFIC ON M3 STRETCH

Fri, 14 Feb 2014

FIRST it was a stretch of the M1 and now the same speed reduction plan has been announced for a stretch of the M3 motorway in Surrey and Hampshire. The Highways Agency (HA) has proposed that a three-mile section of the M3 between junction 3 at Lightwater in Surrey and junction 4 near Farnborough in Hampshire be subject to a 60mph restriction. This section is part of a 13.4-mile stretch that is being upgraded in a £174 million scheme, with the 60mph proposal, to operate between 7am and 7pm daily so air quality levels can be met.